Zhuhai guishan wind farm

Zhuhai guishan project is built in the sea area outside the river mouth of pearl river  ,the longest river of south china. The project is consisted of one 110kv transformer station and 66 wind turbines to generate over 198 MW of clean electricity from the wind farm and input the renewable energy to the regional power grid system. The generated renewable power is used to provide guarantee to sustainable economic growth of pearl river delta.

ZTT was contracted on design and supply 84km MV&HV submarine cables to provide essential link between each turbines and between the transformer stations with main land. Each of ZTT supplied cable incorporates 3 power cores and one optic telecommunication. Triple extrusion process was introduced in simultaneous application of conductor screen ,XLPE insulation, insulation screen by ZTT’s state art VCV extrusion tower. As part of whole package ZTT also supplied related accessories and after sales onsite service.

The cables supplied in this project including 64/110kv 3*500sqmm ;26/35kv 3*70/240/300sqmm.

SUPPLY SCOPE: 84KM HV&MV SUBMARINE CABLE AND ACCESSORIES

TIME2013.05