110kv transmission line to Zhoushan-Xiushan-Daishan islands

ZTT supplied 24.92km of 110kV, 1Cx500mm2 HVAC submarine cable complete with accessories to Zhoushan-Xiushan-Daishan islands; all within a 4 months lead time. The transmission line was constructed by State Grid with the aim of upgrading the power system’s reliability as well as to guarantee a stable regional energy supply.  The cable was specially designed with enhanced mechanical property as it revolved a complex terrain.